Project Overview
John from Berkhamsted, Hertfordshire, was keen to reduce his reliance on the National Grid while making his home more sustainable. Chiltern Solar designed and installed a powerful 7.92kWp solar energy system, complemented by two high-capacity GivEnergy batteries for efficient energy storage.
Installation Timeline
Our streamlined process ensured John’s installation was quick and hassle-free. Here’s the timeline:
Final Quote Issued: 21st May 2024
Order Confirmed: 10th June 2024
DNO Application Approved: 21st June 2024
Installation Confirmed: 24th June 2024
Scaffolding Erected: 1st July 2024
Installation Completed: 11th July 2024
The Installation Process
On 3rd July, our expert team began the installation of 18 Jinko Tiger Neo 440W all-black solar panels. These panels were securely mounted on John’s slate roof by our experienced roofers Luke Crimmins, Eddie Friel, and Oscar Lenane. Their clean, all-black finish added a sleek aesthetic to the property while ensuring optimal performance.
Electricians Rob Howard and Zack Crampton installed the GivEnergy 5kW hybrid inverter and connected two GivEnergy Gen3 9.5kWh batteries, providing John with the ability to store surplus energy for night-time use or cloudy days. Operations Manager Richard Stevens oversaw the project to ensure everything ran smoothly.
Why Choose Solar?
This system is designed to generate an estimated 6852kWh annually, cutting John’s reliance on the National Grid by an impressive 76%. The addition of battery storage means he can maximise his use of renewable energy, making his system as efficient as possible.
Results and Benefits
John’s system is expected to deliver a return on investment within 8 years. The dual batteries ensure surplus energy is stored and used efficiently, reducing energy bills and offering long-term financial and environmental benefits. With this installation, John is contributing to a more sustainable future while enjoying substantial savings.
Installed and commissioned by
John's solar & battery system
View the hardware that we installed for this customer.
18
solar panels
2
batteries
Full list of hardware installed
Use our free solar quote tool
Answer a few questions, draw your roof and our free tool will give you an estimate of how much solar could save you and your household.
Takes 60 seconds
No bills or documents needed
Get a real price estimate with real hardware
Adjust system size and see impact on cost & savings
Instant quote
Case study produced by
Heidi Drewett
Marketing Manager
, Chiltern Solar
Heidi Drewett serves as the Marketing Manager at Agrivert, where she oversees all marketing activities, including the Chiltern Solar division.
Share this article
We'd really appreciate you helping to get the word out, you can share this page via any social media channels or to friends and family via WhatsApp.
Other
domestic
installations
View other Chiltern Solar case studies
Victoria & Aaron's home
An efficient 8.70kWp solar system with energy storage, designed to cut bills and reduce grid reliance.
8.7
kWp
20
panels
10
year ROI
George's home
An 8.01kWp solar system with GivEnergy battery for efficient energy storage and reduced grid reliance.
8.01
kWp
18
panels
8
year ROI
Nick's home
A 5.22kWp solar system with GivEnergy battery for energy efficiency and reduced reliance on the grid.
5.22
kWp
12
panels
7
year ROI
Andrew's home
A two-phase 10.26kWp solar installation with battery storage for increased energy efficiency.
10.26
kWp
24
panels
12
year ROI
Derek's groundmount
A 5.55kWp solar system with Tesla Powerwall for maximum energy independence.
5.55
kWp
15
panels
Richard's groundmount
A 12.07kWp ground-mounted solar system with a Solis inverter, delivering high efficiency and energy independence.
12.07
kWp
35
panels