Mobius Labs 2
Explore our case study on a commercial Solar PV Installation in Hemel Hempstead. Discover how 60 Trina Vertex S+ panels and Growatt hybrid technology deliver approximately 23,000 kWh annually.
Jan 17, 2025
60
6
27
kW
Overview
Location: Hemel Hempstead, Hertfordshire
Date of Installation: January 2025
Type: Commercial
Roof Layout: South-west
Panel Count: 60
System Size: 27 kWp
System Overview
The proposed solar PV system consisted of:
60 x Trina Vertex 450W Monocrystalline
Growatt MID 25 kW 3 phase hybrid inverter
6 x 5 kWh Growatt APX HV 5.0P-B1 Batteries (30 kWh in total)
Performance Estimates
Annual Energy Generation
The annual energy generation for this system is approximately: 23,000 kWh
Consumption & Grid Export
An energy consumption analysis was conducted based on an average household usage of 2,948 kWh per year. The expected distribution of generated electricity was approximately:
Self-consumed directly from solar: 7956 kWh (34%)
Stored and used via battery: 6282 kWh (27%)
Exported to the grid: 8618 kWh (37%)
Losses: 256 kWh (2%)
Smart Export Guarantee (SEG) Eligibility
The installation qualified for SEG payments, allowing excess electricity exported to the grid to be sold back to an electricity supplier. More information on SEG eligibility and applications can be found at Ofgem.
Environmental Impact
The system contributed significantly to reducing the property’s carbon footprint:
Annual CO₂ savings approximately: 4,800 kg C0₂
Equivalent to approximately:
17,000 miles driven by a diesel car
CO₂ absorption of 220 trees annually
Disclaimer: These calculations are based on estimated system output and standard carbon emission factors provided in the UK Government’s 'Greenhouse Gas Reporting: Conversion Factors 2024'. Actual results may vary due to differences in household energy use, weather conditions, and grid carbon intensity.
Performance and Financial Projections
Investment & Expected Savings
The total cost of the installed system was £30,881 (including VAT at 20%). The estimated payback period is approximately: 6 years, with an estimated first year saving of approximately: £4,000.
Disclaimer: Payback periods are estimated based on current electricity prices and SEG rates. Future price changes, electricity consumption habits, and system performance may affect the actual payback timeline.
Frequently Asked Questions
How does the shading affect the system?
No shade
What is the expected performance over time?
The Solar panel performance will reduce by approximately 0.04% per annum. The Solar panel output is guaranteed to be at 87.4% after 30 years
Can excess electricity be sold back to the grid?
Yes
Installation
The system was installed by a trained installation team certified by MCS, RECC, and NAPIT and completed within a short period with minimal disruption to the household.
*the above illustration is based on a unit cost of electricity of 24.5p/kWh and a SEG rate of 15p/kWh
Installed and commissioned by
Mobius Labs
System overview
View the hardware that we installed for this customer.
60
solar panels
6
batteries
Full list of hardware installed
Use our free solar quote tool
Answer a few questions, draw your roof and our free tool will give you an estimate of how much solar could save you and your household.
Takes 60 seconds
No bills or documents needed
Get a real price estimate with real hardware
Adjust system size and see impact on cost & savings
Case study produced by
Heidi Drewett
Marketing Manager
, Chiltern Solar
Heidi is consistently striving to provide you with the most accurate and helpful information about your solar solution.
Other contributors
Team members that contributed to this item
Share this project
We'd really appreciate you helping to get the word out, you can share this page via any social media channels or to friends and family via WhatsApp.
Share on Facebook
Share on Twitter/X
Share on WhatsApp
Share via Email
Copy website address to clipboard
Other
commercial
installations
View other Chiltern Solar case studies
West Bletchley Rail Depot Solar PV Installation
This solar PV installation at West Bletchley Rail Depot features a 153.00 kW ground-mounted system, designed to optimise energy efficiency and reduce reliance on the grid. Generating approximately 128,920 kWh annually, the system makes a significant contribution to sustainability efforts. The project delivers substantial energy savings and long-term operational benefits for the rail depot.
153
kWp
340
panels
Commercial Solar Installation Milton Keynes
The solar PV installation at Milton Keynes features a 62.37 kWp system designed to optimise energy generation for commercial use. Comprising 154 JA Solar 405W Mono PERC Half-Cell MBB Black Frame panels, the system is mounted on a roof with North East, South East, and South West orientations to maximise sunlight exposure throughout the day. Equipped with a Solis 50 kW S5 3 Phase inverter with 5 MPPTs, an Emlite Bi-Directional Generation Meter, a G99 Mains Relay, and a Fireman’s Safety Switch, the system ensures efficient performance and safety. Generating approximately 53,096 kWh annually, it contributes significantly to reducing grid dependence and lowering energy costs for the property.
63.37
kWp
154
panels
The Ceramic Tile Company
92 JA 410W solar panels installed at The Ceramic Tile Company, generating 15,410kWh annually.
37.72
kWp
92
panels
Prestige Press
A 12.6kWp solar system with 30 panels and battery storage installed at Prestige Press in Chesham.
12.6
kWp
30
panels
F E Cardozo
A 11.55kWp solar system featuring 30 JA Solar panels and a Solis 10kW inverter for Chess Business Park in Chesham.
11.55
kWp
30
panels